Website profile

19Fortyfive

19FortyFive: A place where experts analyze defense, national security, foreign policy, and politics. We welcome all viewpoints and ideas.

  • 437articles · 30d
  • 6+ hour agolatest article
  • Aug 15, 2026earliest in window
  • 97%with images
  • 144avg words
articles per day
Categories
  • Transportation 237
  • Conflict, War & Peace 230
  • Sensitive Subjects 213
  • History 72
  • Autos & Vehicles 69
  • Politics 67
  • Economy, Business & Finance 61
  • News 55

Please confirm you are human

This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.

A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.

Hold with a pointer, or hold Space or Enter.

News

19FortyFive
19fortyfive.com > 2026 > 09 > the-a-10-warthog-was-designed-to-destroy-soviet-tanks-in-the-fulda-gap-with-a-30mm-gau-8-cannon-in-the-iran-war-it-used-that-same-gun-against-drones-and-missiles-over-the-gulf-and-in-april-2026-the

The A-10 Warthog Was Designed to Destroy Soviet Tanks in the Fulda Gap With a 30mm GAU-8 Cannon. In the Iran War It Used That Same Gun Against Drones and Missiles Over the Gulf, and in April 2026 the Air Force Reversed Its Early Phase-Out and Kept 3 Squadrons Until 2030.

6+ hour, 23+ min ago   (1103+ words) The Air Force has wanted this aircraft dead for over a decade. Then it spent a war shooting down drones with a gun built in the 1970s to kill armor. When the Fairchild Republic A-10 Thunderbolt II (the “Warthog”) first took to…...

19FortyFive
19fortyfive.com > 2026 > 09 > it-cant-fire-a-gun-and-doesnt-carry-a-bomb-that-was-the-air-force-chief-of-staff-on-the-sr-71-blackbird-an-aircraft-with-17300-sorties-and-zero-losses-to-enemy-fire

"It Can't Fire a Gun and Doesn't Carry a Bomb." That Was the Air Force Chief of Staff on the SR-71 Blackbird, an Aircraft With 17,300 Sorties and Zero Losses to Enemy Fire.

6+ hour, 24+ min ago   (1683+ words) Across its life the SR-71 Blackbird program flew 53,490 hours over 17,300 sorties, including 11,675 hours above Mach 3 — a record of production no other reconnaissance aircraft has approached. The airframe never lost a mission, never lost an aircraft to hostile fire, and still…...

19FortyFive
19fortyfive.com > 2026 > 09 > the-pentagon-cut-the-b-2-bomber-program-from-75400000000-to-61100000000-and-made-every-aircraft-more-expensive-cutting-the-order-from-132-to-21-nearly-quadrupled-the-cost-per-bomber

The Pentagon Cut the B-2 Bomber Program From $75,400,000,000 to $61,100,000,000 and Made Every Aircraft More Expensive. Cutting the Order From 132 to 21 Nearly Quadrupled the Cost per Bomber.

6+ hour, 58+ min ago   (846+ words) What the money bought when it came to the B-2 Spirit stealth bomber: Four General Electric F118s at 17,300 pounds of thrust each, a 172-foot wingspan, 336,500 pounds maximum takeoff weight, 167,000 pounds of fuel and 60,000 pounds of payload, 6,000 nautical miles without a tanker, above…...

19FortyFive
19fortyfive.com > 2026 > 09 > a-boeing-kc-46-pegasus-boom-jammed-in-the-receptacle-of-an-f-22-raptor-100-miles-off-virginia-on-july-8-2025-struck-the-tanker-after-the-aircraft-separated-and-broke-off-into-the-atlantic-the-air

A Boeing KC-46 Pegasus Boom Jammed in the Receptacle of an F-22 Raptor 100 Miles Off Virginia on July 8, 2025, Struck the Tanker After the Aircraft Separated, and Broke Off Into the Atlantic. The Air Force Put the Damage at $9,980,000.

17+ hour, 56+ min ago   (684+ words) On May 12 the Air Force and Boeing announced a readiness plan with an unusual first item: five early-production KC-46s that were not due in operational service until 2031 will instead be broken up for spare parts and test support. The Air…...

19FortyFive
19fortyfive.com > 2026 > 09 > the-f-111b-was-supposed-to-be-a-us-navy-aircraft-carrier-fighter-it-exceeded-80000-pounds-needed-a-wingspan-7-feet-wider-than-the-air-force-version-just-to-slow-down-enough-to-land-and-the-navy-wa

The F-111B Was Supposed to Be a US Navy Aircraft Carrier Fighter. It Exceeded 80,000 Pounds, Needed a Wingspan 7 Feet Wider Than the Air Force Version Just to Slow Down Enough to Land, and the Navy Walked Away in May 1968.

1+ day, 5+ hour ago   (485+ words) McNamara ordered the Air Force and Navy to buy the same aircraft to save money. The two services needed opposite things, and the compromise could not land on a US Navy aircraft carrier. That's why the F-111B failed....

19FortyFive
19fortyfive.com > 2026 > 09 > japans-mach-2-5-f-15j-fighter-wont-ever-fly-for-the-us-air-force-as-it-was-custom-built-for-tokyo

Japan's Mach 2.5 F-15J Fighter Won't Ever Fly for the US Air Force As It Was Custom Built for Tokyo

1+ day, 17+ hour ago   (497+ words) Japan is the largest F-15 operator on earth outside the US Air Force, and has been for forty years. The rebuild costs more than most countries spend on new fighters. The F-15J is a real powerhouse....

19FortyFive
19fortyfive.com > 2026 > 09 > the-us-air-force-built-only-21-b-2-spirits-and-they-cost-about-2000000000-each-it-wants-at-least-100-b-21-raiders-at-roughly-750000000-apiece

The US Air Force Built Only 21 B-2 Spirits and They Cost About $2,000,000,000 Each. It Wants at Least 100 B-21 Raiders at Roughly $750,000,000 Apiece.

3+ day, 6+ hour ago   (498+ words) The B-2 cost $2,000,000,000 a copy because only 21 were built. The B-21 was designed from the start to avoid that, with cost written in as a performance requirement....

19FortyFive
19fortyfive.com > 2026 > 09 > a-uk-ministry-of-defence-official-says-gcap-fighter-will-carry-twice-the-internal-weapons-payload-of-an-f-35-and-control-uncrewed-aircraft-alongside-it-almost-nothing-else-about-the-aircraft-is-publi

A UK Ministry of Defence Official Says GCAP Fighter Will Carry Twice the Internal Weapons Payload of an F-35 and Control Uncrewed Aircraft Alongside It. Almost Nothing Else About the Aircraft Is Public.

3+ day, 10+ hour ago   (548+ words) Japan put $1,270,000,000 into GCAP this year, Italy €8,800,000,000 and Britain £8,600,000,000 over 4 years. The F-35 they are competing with has cost about $412,000,000,000....

19FortyFive
19fortyfive.com > 2026 > 09 > congress-spent-100000000-bringing-just-2-sr-71-blackbirds-back-from-retirement-in-1995-and-another-30000000-in-1997-by-1998-the-program-was-dead-again

Congress Spent $100,000,000 Bringing Just 2 SR-71 Blackbirds Back from Retirement in 1995 and Another $30,000,000 in 1997. By 1998 the Program Was Dead Again.

3+ day, 12+ hour ago   (537+ words) The SR-71 flew 11,675 hours above Mach 3 across the program. By 1990 the 12-aircraft fleet cost about $260,000,000 a year, and the Air Force said that money could run 2 fighter wings....

19FortyFive
19fortyfive.com > 2026 > 09 > the-us-air-force-retired-the-f-117-nighthawk-in-2008-and-never-stopped-flying-it-the-service-now-says-the-aircraft-will-stay-in-the-air-until-2034-26-years-after-its-own-retirement

The US Air Force Retired the F-117 Nighthawk in 2008 and Never Stopped Flying It. The Service Now Says the Aircraft Will Stay in the Air Until 2034 — 26 Years After Its Own Retirement.

3+ day, 12+ hour ago   (598+ words) The F-117 Nighthawk was retired in 2008. It is still flying, and the Air Force says it will keep flying until 2034 — longer in retirement than most aircraft serve....